Concrete repair case studies structural repair structural repair structural repair structural repair structural repair

Masonry Wall Strengthening

The Problem

Grandfather law regarding bill board advertising required owner to strengthen masonry block structure or lose advertising revenue.

The Solution

Owner strengthened existing building using glass frp for in plane shear. Large concrete footings were added to resist overturning of walls. Addition to back of building required shoring prior to construction.


Project Images

Over-all view of structure
Over-all view of structure
Large footings constructed in phases. View of shear key used for structural purposes.
                    Dowel installation beginning at right.
Large footings constructed in phases. View of shear key used for structural purposes. Dowel installation beginning at right.
Cleaned block surface with coving at corners to eliminate straightening of fibers
Cleaned block surface with coving at corners to eliminate straightening of fibers
Shoring of building and view of new footings
Shoring of building and view of new footings
Priming block surface
Priming block surface
Wet lay up method of reinforcing installation
Wet lay up method of reinforcing installation